This three star hotel has undergone several renovations over the past century.  The original portion of the building was a Dutch-colonial style warehouse building facing North and was constructed early 1900.  The structural system of the original 2-story building consisted of a reinforced concrete frame with masonry infill.  Within the past three years, additions were added to the original building in different phases.  Initially, an additional 3-story level was added on top of the existing construction.  The structural system of the new upper addition consisted of a combination of steel gravity framing with concrete over metal deck and reinforced concrete frame with brick infill.  Later on, a 1-story segment concrete structure with brick infill was added on Southwest of the original building, creating an L-shaped footprint.  Finally, a 6-story steel frame structure was added south of the original building, creating a U-shaped footprint with an interior court used as a pool in between the two wings.    

After the 7.6 earthquake in September 30, 2009, the second story of the back portion of the original building segment collapsed towards the pool followed by the 6-story south building segment also collapsing towards the pool.  (Provincial Disaster Center reported 69 fatalities so far).

Many of the buildings that collapsed in Padang have quite a similar history where floor additions were added several times during the life of the building.  The original segment of hotel Ambacang is an extreme case of such type of buildings, which is locally known as the ‘growing building’.  So it is unclear how strict the code enforcement and quality assurance for inspection are being conducted.

Some structural deficiencies, such as defects in the concrete material and non-ductile detailing can be identified from the building damage.  Non-ductile detailing was apparent from the lack of ties used in the concrete columns and poor detail practice observed from the exposed damage.  The structural members are also very lightly reinforced.  Poor splice detail between the addition structure to the existing structure also adds to the list of the structural vulnerabilities observed in the building.  It is likely that the additional segments were added butt-up against each other without consideration of pounding during an earthquake.

Comments

4 Responses to “Ambacang Hotel”

  1. Jessica Rowson on October 16th, 2009 9:23 am

    Hi

    Would we be able to use some of your pictures in our magazine (New Civil Engineer)? We are interested in covering the way that structures responded to this earthquake

    Thanks

    Jessica

  2. admin on October 21st, 2009 11:43 am

    Jessica,
    yes that would be fine. If you can credit the photographer (if that is clear), please do so, along with EERI. Otherwise, please credit EERI. thanks.

  3. nalexander on October 21st, 2009 12:15 pm

    Hi Jessica,

    Sorry for the late response. Yes, you can use the pictures and credit EERI. Let me know if you need higher resolution pictures. These pictures have been compressed to reduce the file size.

  4. Steven Shah on November 1st, 2009 3:58 pm

    Hello Jessica…

    I sm wondering if you are still on location in Padang?

    I am a Building Project Manager and I have just arranged some leave and was wondering if there was anyway that I might assist others during this rebuilding process?

    Please do let me know, You my have already left by now? I am just trying to find a way to assist if possible?

    Sorry to be bothering you with this…

    My thanks in advance.

    Steven – 0418 282 418

Feel free to leave a comment...

You must be logged in to post a comment.