4 WEEKS ON : PRELIMINARY RECONNAISSANCE REPORT FROM THE CHRISTCHURCH 22 FEB 2011 6.3MW EARTHQUAKE

4 Weeks on : Preliminary Reconnaissance REPORT FROM THE CHRISTCHURCH 22 Feb 2011 6.3Mw Earthquake Weng Y Kam[1] , Umut Akguzel[2] , Stefano Pampanin[3] Download the full report (with figures) here. **re-posted from the NZSEE Clearinghouse website. 1         Introduction 1.1      Note This...


Weng Y Kam; Preliminary report on pre-1970s RC buildings, RCM and precast staircases damage.

March 7, 2011 by  
Filed under Masonry, Reinforced Concrete, Structural

The following is a Repost by Weng Y Kam for the NZSEE clearing house: PRELIMINARY REPORT FROM THE CHRISTCHRUCH 22 Feb 2011 6.3 Mw Earthquake: pre-1970s RC and RCM buildings, and precast staircase damage. Weng Y Kam Download the full report (with photographs) here. 1 Introduction The 6.3 Mw Christchurch...


Weng Y Kam; DAY 03 FIELD REPORT: Critically-Damaged Multi-storey RC buildings

The following is a Repost by Weng Y Kam for the NZSEE clearing house: DAY 03 FIELD REPORT FROM THE CHRISTCHURCH 22 Feb 2011 6.3Mw Earthquake: Critically-Damaged Multi-storey RC buildings 1 Introduction to Day 03 Activities While the Urban Search and Rescue (USAR) activities are still the priority...


Earthquake Images Compiled by CSSC

To view selected images of the M6.3 Christchurch Earthquake of Februrary 22, 2011 compiled by the staff of the CA Seismic Safety Commission click here.


NZSEE Report: Critically-Damaged Multi-storey RC buildings

February 25, 2011 by  
Filed under Reinforced Concrete, Structural

    The following is a post pertaining to reinforced concrete buildings by Weng Yuen Kam for the NZSEE. To see the actual post, please follow this link.     DAY 03 FIELD REPORT FROM THE CHRISTCHURCH 22 Feb 2011 6.3Mw Earthquake: Critically-Damaged Multi-storey RC buildings   1....